The following is from the PIB http://pib.nic.in/release/release.asp?relid=33421. (Based on this Orissa will fall behind quite a bit: Only 2000kms of new lines
 none of the major new lines in Orissa, such as Khurda-Balangir, will get completed during the 11th plan. The states where the freight corridor will run and the states with a lot of narrow gauge lines will surge forward.)

In order to carry additional freight and passenger traffic in future, Railways have on hand 272 track capacity works, which on completion would add 20,852 kilometers to the Broad Gauge system.  The estimated throwforward cost of these works is approximately Rs. 55,000 crore.

 

A substantial amount of traffic moves on the High density routes viz. the ones which connect the four metropolitan cities of Delhi, Mumbai, Chennai, Kolkatta, and the Delhi – Gaulhati route.  Railways have already announced construction of two Dedicated Freight Corridors between JNPT-Tughlakabad (1483 kms) and Sonenagar-Ludhiana, (to be later extended to the deep sea port of Kolkatta) (1279 kms) at a cost of more than Rs. 28,000 crores to give relief to two of the densely saturated routes viz. Delhi-Mumbai and Delhi-Kolkata routes.  In addition, feasibility studies have been ordered on four other corridors – (i) North – South (Delhi-Chennai); (ii) East – West (MumbairKolkotta); (iii) South – East (VijayawadaKharagpur ) and (iv) South – South (Chennai – Goa).

In addition, Railway proposes to augment its track capacity in XI Plan by 15,500 kilometers, including 2000 kilometer of new lines, 3500 kilometers of doubling and 10,000 kilometers of gauge conversion.

The revenue earning freight traffic in the XI Five Year Plan period is expected to increase from 728 million tonnes in 2006-07 to 1100 million tonnes in 2011-12.  The corresponding freight output is expected to increase from 475 billion ton kilometers in 2006-07 (prov.) to 707 billion ton kilometers in 2011-12.  In order to cater to the projected freight traffic, it is expected that 62000 wagons would be required during the XI Plan.  Railways will also require to induct 1800 electric and 1800 diesel locomotives for carrying the projected traffic in the XI plan.  In addition to enhance the capacity of the existing diesel and electric locomotive manufacturing units, Railways are also going in for setting up a diesel locomotive factory at Marhowra and electric loco factory at Madhepura which will produce 150 and 120 locos per year respectively.

Since capacity augmentation takes time, Railways have taken immediate steps to enhance the throughput by increasing the carrying capacity of wagons by 6 tonnes on most of the routes and by 8 tonnes on selected routes and also strengthen the track, bridges and allied structures.  In addition, 28 heavy mineral routes with over 6900 route kilometers have been further identified for implementation of 25 tonne Axle load.  Also on selected routes, double stack containers trains have been permitted to further enhance the throughput per train.

Railways also plan to induct wagons of better design, higher capacity, longer life and low on maintenance.

The passenger traffic in the XI Five Year Plan is expected to increase from 6242 million passengers in 2006-07 (RE) to 8400 million in 2011-12.  The correspondence passenger output is expected to increase from 700 billion passenger kilometers to 880 billion passenger kilometers.

In order to cater to this increase in traffic, it is expected that 22500 coaches would be required  during the XI Five Year Plan,  implying a yearly requirement of 4500 coaches.  In order to meet this requirement , the production capacities of the existing units –integral Coach Factory, Prembur  and Rail Coach Factory, Kapurthanla – are being enhanced to 1500 and 1400 coaches per annum respectively from the  present capacity of 1000 coaches per annum each.  Further, a new coach factory is also being planned to be set up at Rai Bareily to bridge the shortfall in requirement and production capacities.

 

Railways have constructed a total of 4084 kilometers of track in the last three years.  The details are as under :

 

Category

New Lines

Doubling

Gauge Conversion

Total

2004-05

150

779

282

1211

2005-06

180

744

231

1155

2006-07

250

1082

386

1718

Total

580

2605

899

4084

 

This information was given by the Minister of State for Railways Shri R.Velu in written reply to a question in the Lok  Sabha today.