{"id":215,"date":"2007-07-12T18:18:59","date_gmt":"2007-07-12T22:18:59","guid":{"rendered":"http:\/\/www.orissawatch.org\/Infra\/?p=215"},"modified":"2007-07-12T18:18:59","modified_gmt":"2007-07-12T22:18:59","slug":"terms-of-reference-set-for-environmental-impact-assesment-about-2-power-projects-in-orissa","status":"publish","type":"post","link":"https:\/\/www.orissalinks.com\/orissagrowth\/archives\/215","title":{"rendered":"Terms of reference set for environmental impact assesment about 2 power projects in Orissa"},"content":{"rendered":"<p><a href=\"http:\/\/www.financialexpress.com\/fe_full_story.php?content_id=169897\">Financial Express reports<\/a> on this. Following are some excerpts.<\/p>\n<blockquote><p><em>The ministry of environment and forest (MoEF) has prescribed the terms of reference (ToR) for preparation of the draft environment impact assessment (EIA) report pertaining to five power projects with the total generation capacity of 2,685 mw. <\/em><\/p>\n<p><em>The project list includes Tata Power Company\u2019s (TPC) Jojobera project in Jharkhand (120-mw), MahaGenco\u2019s Bhusawal thermal project in Maharashtra (300-mw), KvK Nilachal\u2019s 600-mw project in Orissa, CESC\u2019s 660-mw project in Purba Medinipur (West Bengal) and Monnet Ispat\u2019s project in Orissa<\/em>.<\/p><\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>Financial Express reports on this. Following are some excerpts. The ministry of environment and forest (MoEF) has prescribed the terms of reference (ToR) for preparation of the draft environment impact assessment (EIA) report pertaining to five power projects with the total generation capacity of 2,685 mw. The project list includes Tata Power Company\u2019s (TPC) Jojobera [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[67],"tags":[],"class_list":["post-215","post","type-post","status-publish","format-standard","hentry","category-industry-thermal-power"],"_links":{"self":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/posts\/215","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/comments?post=215"}],"version-history":[{"count":0,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/posts\/215\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/media?parent=215"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/categories?post=215"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/tags?post=215"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}