{"id":2626,"date":"2009-09-07T19:21:15","date_gmt":"2009-09-07T23:21:15","guid":{"rendered":"http:\/\/www.orissalinks.com\/orissagrowth\/?p=2626"},"modified":"2009-09-07T19:21:15","modified_gmt":"2009-09-07T23:21:15","slug":"orissa-cabinet-approves-proposed-expansion-of-unit-3-and-unit-4-of-the-ib-thermal-power-station-of-opgc","status":"publish","type":"post","link":"https:\/\/www.orissalinks.com\/orissagrowth\/archives\/2626","title":{"rendered":"Orissa cabinet approves proposed expansion of unit 3 and unit 4 of the Ib Thermal Power Station of OPGC"},"content":{"rendered":"<p>Following is an excerpt from <a target=\"_self\" href=\"http:\/\/www.business-standard.com\/india\/news\/orissa-cabinet-approves-2x-660mw-configuration-for-opgc-expansion\/369353\/\">a report in Business Standard<\/a>.<\/p>\n<blockquote>\n<p>The Orissa cabinet today approved a proposal of the Orissa Power Generation Corporation (OPGC), a joint venture between the Orissa government and the AES, to adopt super critical technology with a configuration of 2X260 Mw and sharing of power for the proposed expansion of unit 3 and unit 4 of the Ib Thermal Power Station of OPGC.<\/p>\n<p>The cabinet chaired by the chief minister Naveen Patnaik also allowed OPGC a time gap of 6 months between the commissioning of the 3rd and 4th units.<\/p>\n<p>However, in case of delay in commissioning of the 4th unit beyond 6 months, OPGC would have to give 450 Mw from the 3rd unit against the approved 420 Mw.<\/p>\n<\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>Following is an excerpt from a report in Business Standard. The Orissa cabinet today approved a proposal of the Orissa Power Generation Corporation (OPGC), a joint venture between the Orissa government and the AES, to adopt super critical technology with a configuration of 2X260 Mw and sharing of power for the proposed expansion of unit [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[32,388,67],"tags":[],"class_list":["post-2626","post","type-post","status-publish","format-standard","hentry","category-district-jharsugurha","category-orissa-govt-action","category-industry-thermal-power"],"_links":{"self":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/posts\/2626","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/comments?post=2626"}],"version-history":[{"count":0,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/posts\/2626\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/media?parent=2626"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/categories?post=2626"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/tags?post=2626"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}