{"id":3465,"date":"2010-04-17T22:26:37","date_gmt":"2010-04-18T02:26:37","guid":{"rendered":"http:\/\/www.orissalinks.com\/orissagrowth\/?p=3465"},"modified":"2010-04-17T22:26:37","modified_gmt":"2010-04-18T02:26:37","slug":"news-round-up-3-more-terminal-markets-at-cuttack-berhampur-mou-with-ipps-595-crores-for-water-body-upgrade-mega-food-park-at-malipada","status":"publish","type":"post","link":"https:\/\/www.orissalinks.com\/orissagrowth\/archives\/3465","title":{"rendered":"News round-up: 3 more terminal markets at Cuttack, Berhampur &#038; Rourkela; MOU with IPPs; 595 crores for water body upgrade; Mega food park at Malipada"},"content":{"rendered":"<p>1. <a href=\"http:\/\/economictimes.indiatimes.com\/markets\/commodities\/Orissa-to-build-three-more-terminal-market-yards-for-farmers\/articleshow\/5798694.cms\" target=\"_self\">Economic Times on 3 more terminal markets in Odisha<\/a>:<\/p>\n<blockquote>\n<p>Orissa government will provide four terminal market yards to enable the  farmers to sell their produce at market prices&#8230;. One of the terminal has already been constructed at Sambalpur with an investment <a href=\"http:\/\/economictimes.indiatimes.com\/markets\/commodities\/Orissa-to-build-three-more-terminal-market-yards-for-farmers\/articleshow\/5798694.cms#\" style=\"text-decoration: underline ! important; position: static;\" class=\"kLink\" target=\"undefined\" id=\"KonaLink0\"><span id=\"preLoadWrap0\" class=\"preLoadWrap\" style=\"position: relative;\"><\/p>\n<div id=\"preLoadLayer0\" style=\"position: absolute; z-index: 4000; top: -32px; left: -18px; display: none;\"><img decoding=\"async\" class=\"preloadImg\" src=\"http:\/\/kona.kontera.com\/javascript\/lib\/imgs\/grey_loader.gif\" style=\"border: medium none; width: 22px; height: 22px;\" alt=\"\" \/><\/div>\n<p><\/span><\/a> of Rs 86 crore and three others are  coming up at Cuttack, Berhampur and Rourkela,&#8230;<\/p>\n<\/blockquote>\n<p>2. <a href=\"http:\/\/www.business-standard.com\/india\/news\/state-signs-mous5-ipps-to-generate-4800-mw\/391413\/\" target=\"_self\">Business Standrad on MOU with five IPPs for 4800 MW power<\/a>:<\/p>\n<blockquote>\n<p>The cumulative capacity of these projects would be 4800 Mw and the total  investment is envisaged to be Rs 23203.52 crore.<\/p>\n<p>With this, the total power generation projected in the state would  increase to 31100 Mw from 26300 Mw earlier.The Orissa government has  already inked MoUs with 21 IPPs with an aggregate generation capacity of  26,300 Mw earlier.<\/p>\n<p>&#8230; Five companies who signed the MoU included BGR Energy System, JR  Powergen Private Ltd, Adhunik Power and Natural Resources Ltd, Maa Durga  Thermal Power Company Ltd and Vijaya Ferro and Power Private Ltd.<\/p>\n<p>JR Powergen Private Ltd would set up a 1980 Mw thermal power plant at  Kishorenagar near <u>Angul<\/u> at an investment of Rs 7988 crore. BGR Energy  Systems Ltd also plans to set up a 1320 Mw power plant at Bhapur in  <u>Nayagarh<\/u> district at an investment of Rs 6287 crore.<\/p>\n<p>Similarly, Adhunik Power and Natural Resources Ltd would set up a  1320 Mw power plant at Birmaharajpur in <u>Sonepur<\/u> district entailing an  investment of Rs 8079.74 crore. All these proposals were cleared by the  High Level Clearance Authority (HLCA) chaired by the chief minister  Naveen Patnaik.<\/p>\n<p>On the other hand, Maa Durga Thermal Power would set up a 60 Mw  ((2x30Mw) power plant at <u>Tangi in Cuttack<\/u> district, involving an  investment of Rs 296.95 crore. Besides, Vijaya Ferro and Power Private  Ltd, planning to set up a 120 Mw power plant (IPP) at an investment of  Rs 550 crore at <u>Kesinga (Turla Khamar) in Kalahandi<\/u> district.<\/p>\n<p>The total land requirement for these projects have been assessed at  4360 acres and about 22,325 direct and indirect employment opportunities  are expected to be created when these projects would be fully  commissioned. Three projects namely BGR Energy System, JR Powergen  Private Ltd, Adhunik Power and Natural Resources Ltd would source water  from the Mahanadi river system, Maa Durga Thermal Power would draw water  from Birupa river.Vijaya Ferro and Power plans to source water from Tel  river.<\/p>\n<\/blockquote>\n<p>3. <a href=\"http:\/\/beta.thehindu.com\/business\/companies\/article391029.ece\" target=\"_self\">Hindu on preliminary bids for UMPP at Bedabahal<\/a>:<\/p>\n<blockquote>\n<p>the government was likely to invite preliminary bids for  the 4,000-MW Ultra Mega Power Project (UMPP) at Bedabahal in Orissa by  April 30.<\/p>\n<p class=\"body\">The request for qualification (RSQ) for  the project may be issued by April 30.<\/p>\n<p class=\"body\">This  Bedabahal project would be the sixth UMPP project. The government has  already awarded four UMPPs, of which three &mdash; Sasan in Madhya Pradesh,  Krishnapatnam in Andhra Pradesh and Tilaiya in Jharkhand &mdash; have been  bagged by Reliance Power.<\/p>\n<\/blockquote>\n<p class=\"body\">4. <a href=\"http:\/\/sify.com\/finance\/orissa-gets-rs-595-14-crore-for-water-body-upgrade-news-news-kegcajhjfed.html\" target=\"_self\">Sify on 595 crores for waterbody upgrade<\/a>:<\/p>\n<blockquote>\n<p class=\"body\"><span class=\"verdana12black1a height18a\"><\/p>\n<p>As many as 1817 water  bodies, mostly the minor irrigation projects (MIPs) in 20 districts of  Orissa, would be revitalized under the Centrally sponsored scheme of  Repair, Renovation and Restoration (RRR) of Water Bodies.<\/p>\n<p>These water bodies would be revitalized within a period of three  years at an estimated cost of Rs 595.14 crore.<\/p>\n<p>The funding for these projects would be shared between the Government  of India and the Orissa government in the ratio of 90:10 for the Maoist  infested, drought prone and backward districts of Kalahandi, Bolangir  and Koraput (KBK).<\/p>\n<p>For the other districts, the share between the Centre and the state  government will be 25 per cent and 75 per cent respectively.<\/p>\n<p>While the design ayacut of all 1817 projects was 2, 48,545.86  hectares, the irrigation potential of an additional 89,110.02 hectares  of land would be revived through these projects, sources said.<\/p>\n<p>Most of these projects under the RRR scheme are being taken up in  south Orissa&#8217;s Ganjam district. About 800 projects under the scheme are  to be taken up in the district at a cost of Rs 250.87 crore.<\/p>\n<p>&#8230; Apart from Ganjam and KBK,  the other districts where the scheme will be implemented are Bargarh,  Bolangir, Gajapati, Jajpur, Kalahandi, Kandhamal, Koraput, Mayurbhanaj,  Nabarangapur, Nayagarh, Nuapada, Rayagada, Sambalpur, Sundargarh,  Balasore, Malkanagiri, Subarnapur, Deogarh and Dhenkanal.<span class=\"verdana12black1a height18a\"><\/p>\n<p>The pilot project for this scheme was implemented for 137 projects in  Ganjam and Gajapati districts at a cost of Rs 18.84 crore during  2005-06 to 2008-09.<\/p>\n<p><\/span><\/p>\n<p><\/span><\/p>\n<\/blockquote>\n<p class=\"body\"><span class=\"verdana12black1a height18a\"><\/p>\n<p><span class=\"verdana12black1a height18a\"><\/p>\n<p>5. <a href=\"http:\/\/beta.thehindu.com\/business\/Economy\/article318785.ece?homepage=true\" target=\"_self\">Hindu on Japan giving 150 crores for an irrigation project<\/a>:<\/p>\n<p><\/span><\/p>\n<p><\/span><\/p>\n<blockquote><p>Japan will also give &#8230; over Rs 150 crore for  Rengali irrigation project in Orissa. <\/p><\/blockquote>\n<p>6. <a href=\"http:\/\/www.hospitalitybizindia.com\/detailNews.aspx?aid=7784&amp;sid=1\" target=\"_self\">Hospitalitbizindia on a mega food park at Malipada, Khurda<\/a>:<\/p>\n<blockquote>\n<p>Government of India is likely to set up a mega food park and a marine  food park at Malipara near Khurda in Orissa with an area of 282 acres.  This information was given by Subodh Kant Sahai, Union Minister for Food  Processing while responding to a demand raised by Naveen Patnaik, Chief  Minister, Orissa at the Orissa Investors meet 2010.<\/p>\n<\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>1. Economic Times on 3 more terminal markets in Odisha: Orissa government will provide four terminal market yards to enable the farmers to sell their produce at market prices&#8230;. One of the terminal has already been constructed at Sambalpur with an investment of Rs 86 crore and three others are coming up at Cuttack, Berhampur [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10,25,12,26,55,48,5,623,11,446,16,15,9,35,28,63,7,34,98,23,14,18,29,24,17,54,20,772,22,21,67,226],"tags":[],"class_list":["post-3465","post","type-post","status-publish","format-standard","hentry","category-district-angul","category-district-balangir","category-district-balasore","category-district-bargarh","category-berhampur-gopalpur-chhatrapur","category-bhubaneswar-cuttack-puri","category-district-cuttack","category-dam-project","category-district-dhenkanal","category-food-processing","category-district-gajapati","category-district-ganjam","category-district-jajpur","category-district-kalahandi","category-district-kandhamala","category-district-kbk-plus","category-district-khordha","category-district-koraput","category-loans","category-district-malkangiri","category-district-mayurbhanj","category-district-nabarangpur","category-district-nayagarha","category-district-nuapada","category-district-rayagada","category-rourkela-kansbahal","category-district-sambalpur","category-sambalpur-burla-jharsuguda","category-district-sonepur","category-district-sundergarh","category-industry-thermal-power","category-water-management"],"_links":{"self":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/posts\/3465","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/comments?post=3465"}],"version-history":[{"count":0,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/posts\/3465\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/media?parent=3465"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/categories?post=3465"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/tags?post=3465"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}