{"id":3813,"date":"2010-07-28T12:56:06","date_gmt":"2010-07-28T16:56:06","guid":{"rendered":"http:\/\/www.orissalinks.com\/orissagrowth\/?p=3813"},"modified":"2010-07-28T12:56:06","modified_gmt":"2010-07-28T16:56:06","slug":"initial-plans-for-a-bhubaneswar-cuttack-khurda-metro-rail","status":"publish","type":"post","link":"https:\/\/www.orissalinks.com\/orissagrowth\/archives\/3813","title":{"rendered":"Initial plans for a Bhubaneswar-Cuttack-Khurda metro rail"},"content":{"rendered":"<p>Following is an excerpt from <a href=\"http:\/\/www.telegraphindia.com\/1100728\/jsp\/orissa\/story_12739502.jsp\" target=\"_self\">a report in Telegraph<\/a>.<\/p>\n<blockquote>\n<p>To reduce road traffic congestion, the  state transport department has initiated steps to connect the twin city  of Bhubaneswa and Cuttack by metro rail. The service would cover almost  150 km between the two cities touching 20 vital points.<\/p>\n<p align=\"left\" class=\"story\">Delhi Metro Rail Corporation (DMRC) has  been asked to conduct a survey. Later the state government would  undertake the construction work with technical assistance from DMRC.  &ldquo;The work is expected to be over by 2030. The construction work would  start from 2020,&rdquo; said transport secretary Satyabrata Sahu.<\/p>\n<p align=\"left\" class=\"story\">The service would be extended upto the  expanded areas of Bhubaneswar Development Authority (BDA) and Cuttack  Development Authority (CDA). &ldquo;It means, people can travel from Jatni to  Choudwar, about 55 km&rdquo;, he said.<\/p>\n<p align=\"left\" class=\"story\">Considering the cost component, the state  government has planned to lay separate over-road tracks for metro rails  instead of underground ones.<\/p>\n<p align=\"left\" class=\"story\">Trains will sneak through major junctions,  covering almost 150 km. Soon after the survey, the state government  would make budgetary provisions for laying of tracks.<\/p>\n<p align=\"left\" class=\"story\">&#8230;&nbsp; &ldquo;It is expected that the population of the  twin cities will cross 50 lakh by the end of 2030. Immediate steps need  to be taken to shift traffic congestion. As a solution to the traffic  congestion, we have planned to introduce metro rail&rdquo;, said transport  minister Sanjiv Sahu.<\/p>\n<\/blockquote>\n<p>The graphics accompanying this article has a dead link. It has the list of the 20 key places the metro rail will touch. By enlarging I could read the following names: Jatni, Khurda, P&#8212;, Khandagiri, Kalinga studio square, CRP square, Power house square, Jayadev Vihar, Acharya Vihar, Vani Vihar, Rasulgarh,&nbsp; Naharkanta, Pahala, Phulnakhara, Link Road, Badam Badi, Mangalabag, OMP, Manguli Square, and Chowduar.<\/p>\n<p>The target date to start construction is 2020 and operation is 2030. That is too far in the future. Kochi, which is a similar sized metro area as Bhubaneswar-Cuttack is far ahead in the process. See <a href=\"http:\/\/kochimetrorail.blogspot.com\/\" target=\"_self\">http:\/\/kochimetrorail.blogspot.com\/<\/a>. (<a href=\"http:\/\/www.world-gazetteer.com\/wg.php?x=&amp;men=gcis&amp;lng=en&amp;dat=80&amp;geo=-104&amp;srt=npan&amp;col=aohdq&amp;msz=1500&amp;pt=a&amp;va=x&amp;srt=pnan\" target=\"_self\">As per the World-Gazetteer greater Bhubaneswar has a population of 1.696 million while greater Kochi has a population of 1.564 million<\/a>.)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Following is an excerpt from a report in Telegraph. To reduce road traffic congestion, the state transport department has initiated steps to connect the twin city of Bhubaneswa and Cuttack by metro rail. The service would cover almost 150 km between the two cities touching 20 vital points. Delhi Metro Rail Corporation (DMRC) has been [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[48,7,71],"tags":[],"class_list":["post-3813","post","type-post","status-publish","format-standard","hentry","category-bhubaneswar-cuttack-puri","category-district-khordha","category-tnc-all"],"_links":{"self":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/posts\/3813","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/comments?post=3813"}],"version-history":[{"count":0,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/posts\/3813\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/media?parent=3813"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/categories?post=3813"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/tags?post=3813"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}