{"id":5069,"date":"2011-07-14T22:24:02","date_gmt":"2011-07-15T02:24:02","guid":{"rendered":"http:\/\/www.orissalinks.com\/orissagrowth\/?p=5069"},"modified":"2011-07-14T22:24:02","modified_gmt":"2011-07-15T02:24:02","slug":"update-on-paradeep-pcpir","status":"publish","type":"post","link":"https:\/\/www.orissalinks.com\/orissagrowth\/archives\/5069","title":{"rendered":"Update on Paradeep PCPIR"},"content":{"rendered":"<p>Following is an excerpt from <a href=\"http:\/\/orissadiary.com\/CurrentNews.asp?id=27893\" target=\"_self\">a report in Orissadiary.com<\/a>.<\/p>\n<blockquote>\n<p>&#8230; Orissa Govt has gone&nbsp; ahead to make budgetary provisions for  providing basic infrastructure to attract the investors to this region.  The expenditure requirement was discussed today in a high level meeting  held under the Chairmanship of Chief Secretary Bijaya Kumar Patnaik in  the Secretariat conference hall.<\/p>\n<p>It has been decided in the meeting that the Project is to&nbsp; covering  284.15 Sq.Kms. in Jagatsingpur and Kendrapara Districts will be  developed in two phases viz. phase-1 covering 195 Sq.kms and phase-11  covering 89 sq. kms. The Project Proposal has been approved by Govt of  India. IDCO has been selected as the Nodal Agency and IOCL selected as  Anchor Tenant for development of PCPIR. The estimated budget for  external infrastructure has been tentatively calculated at Rs.13634 Cr.  The entire expenditure has been proposed to be borne jointly by Govt of  Odisha, Government of India and Public Private Partnership.<\/p>\n<p>The external infrastructure includes <span style=\"background-color: rgb(255, 255, 153);\">Green Field Coastal Corridor  from Astarang to Dhamara via Paradeep<\/span> ( 140Kms identified under Odisha  and Andhra Pradesh PCPIR), <span style=\"background-color: rgb(255, 255, 153);\">Bhubaneswar- Paradeep Corridor<\/span>(73 Kms.) ,  other Arterial roads, Port upgradation with new facilities, water  supply, Taladanda&nbsp; &amp; Kendrapara canal lining, Captive Power Plant(  2x500MW) , New sub-stations and feeder lines, rail freight stations  along with additional rail sidings, Logistic hubs near Bhutmundei,  proposed air port , waste water treatment system and solid waste  management. Up gradation of NH-5A ( 78 kms) to 4 lane&nbsp; and expansion of  Cuttack &ndash;Paradeep State High Way other important proposed&nbsp; road projects. The total power requirement has been estimated at 2000 MW.<\/p>\n<p>The demand of water for new projects in region will be 620 MLD&nbsp; in  different phases. Different water treatment systems like CETP &amp; STP  have been proposed at each of the chemical parks with estimate of 431  cr. Solid waste management system has been proposed&nbsp; for disposal&nbsp;  industrial and domestic waste at the estimated cost of 200 Cr. Concerned  departments have been directed to take up feasibility assessment and  prepare detail project<br \/>\nreports for inclusion in state budget and recommendation to Govt of India for inclusion in 12th&nbsp; Five Year Plan.<\/p>\n<\/blockquote>\n<p>Following is from Dharitri.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" width=\"515\" height=\"532\" src=\"http:\/\/www.orissalinks.com\/orissagrowth\/wp-content\/uploads\/image\/Screen shot 2011-07-14 at 3_50_01 PM.png\" alt=\"\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Following is an excerpt from a report in Orissadiary.com. &#8230; Orissa Govt has gone&nbsp; ahead to make budgetary provisions for providing basic infrastructure to attract the investors to this region. The expenditure requirement was discussed today in a high level meeting held under the Chairmanship of Chief Secretary Bijaya Kumar Patnaik in the Secretariat conference [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[50,610,8,30,100,705,86],"tags":[],"class_list":["post-5069","post","type-post","status-publish","format-standard","hentry","category-bhubaneswar-paradip","category-dharitri-in-oriya","category-district-jagatsinghpur","category-district-kendrapada","category-paradip-jatadhari-kujanga","category-pcpir","category-petrochemicals"],"_links":{"self":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/posts\/5069","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/comments?post=5069"}],"version-history":[{"count":0,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/posts\/5069\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/media?parent=5069"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/categories?post=5069"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/tags?post=5069"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}