{"id":5403,"date":"2011-11-19T16:46:01","date_gmt":"2011-11-19T20:46:01","guid":{"rendered":"http:\/\/www.orissalinks.com\/orissagrowth\/?p=5403"},"modified":"2011-11-19T16:46:01","modified_gmt":"2011-11-19T20:46:01","slug":"work-starts-on-paradeep-choudwar-rourkela-industrial-corridor","status":"publish","type":"post","link":"https:\/\/www.orissalinks.com\/orissagrowth\/archives\/5403","title":{"rendered":"Work starts on Paradeep-Choudwar-Rourkela Industrial Corridor"},"content":{"rendered":"<p>Following is an excerpt from <a target=\"_self\" href=\"http:\/\/ibnlive.in.com\/news\/choudwarrourkela-industrial-corridor-begins\/203827-60-117.html\">a report in ibnlive.com<\/a>.<\/p>\n<blockquote>\n<p>The state government has started work on development of a railway  corridor through Choudwar to Rourkela to allow ease of inward and  outward transportation of goods from the industrial hubs and mining  belts along the region.<\/p>\n<p class=\"txt\" id=\"font_text\">Land  acquisition for the project, the first of its kind initiative by a state  government, has already been initiated by the Industrial Infrastructure  Development Corporation (Idco). The project would go on ground after  the land acquisition and is targeted to be completed by 2015, said Idco  CMD Priyabrata Patnaik on Friday.<\/p>\n<p class=\"txt\" id=\"font_text\">The  corridor involves development of extensive rail and road connectivity,  along with provisioning of water supply and other infrastructural  facilities. The corridor would encompass two track railway lines and  six-lane road passing through the industrial hubs and the coal mining  belts. New industrial areas and downstream units would be developed  along the corridor.<\/p>\n<p class=\"txt\" id=\"font_text\">Common  infrastructure facilities under the corridor would solve the problems of  inward and outward transportation of goods and minerals. The stretch  would pass through the heart of coal mining operations in the state,  which harbours about 65 billion tonne of reserves. The coal reserves in  the Talcher belt only is around 43 billion tonne.<\/p>\n<p class=\"txt\" id=\"font_text\">The  corridor would cover 17 large and mega-industries, along with 57 other  units, through the stretch from Choudwar to Rourkela. Traffic projection  on the route is given out as 8.7 million tonne.<\/p>\n<p class=\"txt\" id=\"font_text\">The  route would have 163 km of railway track length and 465 km on road. As  many as 308 minor bridges and 77 major bridges would have to be  constructed on it, said Patnaik.<\/p>\n<\/blockquote>\n<p class=\"txt\" id=\"font_text\">Note 1: The 163 km of railway track probably refers to the Talcher-Bimlagarh segment.<\/p>\n<p class=\"txt\" id=\"font_text\">Note 2: Although the above report only mentions the Choudwar-Rourkela part, in earlier documents there is mention of Paradeep-Choudwar-Rourkela industrial corridor. See for example <a target=\"_self\" href=\"http:\/\/www.business-standard.com\/india\/news\/orissa-plans-paradeep-rourkela-industrial-corridor\/381018\/\">this 2009 Business Standard report<\/a>. Following are some excerpts from that.<\/p>\n<blockquote>\n<p>The Orissa government plans to develop an industrial corridor running  from Paradeep to Rourkela through industrial hubs like Choudwar,  Talcher and Sambalpur.<\/p>\n<p>Though the initial proposal was to have an industrial corridor  originating from Choudwar to Rourkela, the proposal was modified to  extend the corridor till Paradeep to allow inward and outward transport  of goods through the Paradeep port, sources said.<\/p>\n<p>&#8230; The proposed industrial corridor will be in line with the Delhi-Mumbai  Industrial Corridor and is designed to pass through national highway  no.42 and national highway no 5 (A).<\/p>\n<p>Under the project, both road and rail corridor will be developed,  which will be the backbone of the proposed project. The industrial  estates and down stream units would be developed over 25 km area on both  sides of the corridor.<\/p>\n<p>IL&amp;FS has been appointed as the consultant for the project and it  has already submitted the pre-feasibility study report to the industry  department on the project. However, the detail cost of the project is  yet to be worked out yet, sources added.<\/p>\n<p>&#8230;<\/p>\n<p>The latest initiative of the state government follows a similar  initiative to develop a common &#8216;rail-road-water pipeline and  infrastructure corridor&#8217; in Meramundali-Angul-Talcher-Chhendipada belt,  to facilitate movement of coal in the Talcher coalfield area.<\/p>\n<p>The project is estimated to cost about Rs 5000 crore including Rs  2000 crore for 2-line rail corridor and Rs 1100 crore for 4 lane road  alongside it. The land width of the proposed corridor will be 300 metre  which includes 60 metre for road and 20 metre for water pipeline.<\/p>\n<p>The total length of the corridor is 137 kilometre which includes  length of 43 number of major bridges to be constructed on this stretch.  RITES Ltd has already submitted a pre-feasibility report to the state  owned Industrial Infrastructure Development Corporation of Orissa Ltd.  (Idco) on the project.<\/p>\n<p>The project is designed to have multi-point centralised loading  stations conceived along the corridor rather than individual bulb  connections with a view to avoid interference or wastage of coal bearing  areas. Road and water pipe alignment will run parallel to rail  alignment, sources said.<\/p>\n<p>It will be connected to rail line at three locations- Jharpada, Angul  and Budhapanka. The common corridor will have multiple entry and exit  points and no surface crossing. Besides, flyovers are proposed to avoid  cross movements at junction stations.<\/p>\n<p>This &#8216;rail-road-water pipeline and infrastructure corridor&#8217; in  Meramundali-Angul-Talcher-Chhendipada belt is projected to handle 113  million tonne coal by 2014-15. It includes 55 million tonne coal  movement required by the power companies, 40.76 million tonne by steel  companies and 17.22 million tonne by other industries.<\/p>\n<\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>Following is an excerpt from a report in ibnlive.com. The state government has started work on development of a railway corridor through Choudwar to Rourkela to allow ease of inward and outward transportation of goods from the industrial hubs and mining belts along the region. Land acquisition for the project, the first of its kind [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[10,58,48,51,510,5,503,334,11,443,9,73,32,61,30,7,557,100,54,53,20,506,772,56,21,507,576],"tags":[],"class_list":["post-5403","post","type-post","status-publish","format-standard","hentry","category-district-angul","category-anugul-talcher-saranga-nalconagar","category-bhubaneswar-cuttack-puri","category-bhubaneswar-dhenkanal-anugul","category-ckp-bhalulata-rourkela-jharsuguda-jn-daghora-bilaspur","category-district-cuttack","category-cuttack-paradeep","category-cuttack-paradip","category-district-dhenkanal","category-idco","category-district-jajpur","category-jharsugurha-sambalpur-bargarh","category-district-jharsugurha","category-jharsugurha-brajarajnagar-belpahar","category-district-kendrapada","category-district-khordha","category-paradeep-port","category-paradip-jatadhari-kujanga","category-rourkela-kansbahal","category-rourkela-jharsugurha","category-district-sambalpur","category-sambalpur-talcher","category-sambalpur-burla-jharsuguda","category-sambaplur-burla-baragarh-chipilima-hirakud","category-district-sundergarh","category-talcher-barang","category-talcher-bimlagarh-under-constr"],"_links":{"self":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/posts\/5403","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/comments?post=5403"}],"version-history":[{"count":0,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/posts\/5403\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/media?parent=5403"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/categories?post=5403"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/tags?post=5403"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}