{"id":5516,"date":"2012-01-28T13:38:04","date_gmt":"2012-01-28T17:38:04","guid":{"rendered":"http:\/\/www.orissalinks.com\/orissagrowth\/?p=5516"},"modified":"2012-01-30T00:55:27","modified_gmt":"2012-01-30T04:55:27","slug":"bhubaneswar-railway-station-desperately-needs-additional-platforms","status":"publish","type":"post","link":"https:\/\/www.orissalinks.com\/orissagrowth\/archives\/5516","title":{"rendered":"Bhubaneswar railway station desperately needs additional platforms"},"content":{"rendered":"<p><strong>Update<\/strong>: Thanks very much Bikash Dash for the pointer to <span class=\"hasCaption\"> <a rel=\"nofollow nofollow\" target=\"_blank\" href=\"http:\/\/wiki.iricen.gov.in\/doku\/lib\/exe\/fetch.php?media=9209%3Aabkhare.pdf\"><span>http:\/\/wiki.iricen.gov.in\/<\/span><wbr><\/wbr><span>doku\/lib\/exe\/<\/span><wbr><\/wbr><span>fetch.php?media=9209%3Aabkh<\/span><wbr><\/wbr>are.pdf<\/a><\/span>. The solution presented there is good enough. My only comment would be that since the expansion of existing Bhubaneswar station is economically feasible, they should just go ahead with that immediately (asap) and at the same time start acquiring land in the New Barang location so that a large station can come up there in 10-15 years when that will be needed.<\/p>\n<hr width=\"100%\" size=\"2\" \/>\n<p>The Bhubaneswar railway station currently has only FOUR platforms. That is too little for the volume of trains and passengers it caters to and will cater to in the future. Besides being on the main Howrah-Chennai line and the ECOR headquarter, with the Bhubaneswar metro area growing and many new lines in the anvil (Khurda-Balangir, possible new line to Astarang to serve the proposed port there, Khurda Rd To Rajahthagarh completing a circuit)&nbsp; there will soon&nbsp; be need for many local train circuits with more frequent trains.<\/p>\n<p>All this means that even if a new station near Barang (15-16 kms from Bhubaneswar) is constructed with enough platforms, because of the central location of the Bhubaneswar station, the later needs to be expanded with additional platforms.<\/p>\n<p>But there is no horizontal available land in parallel to the exisiting platforms.<\/p>\n<p>I envision two possible solutions:<\/p>\n<p>(i) Going vertical and creating another layer of platforms either under or above the existing platforms. But that would add may be another 4 platforms.<\/p>\n<p>(ii) Another possibility is to go under and create a terminus under the area marked in blue in the pictures below. All those land is owned by the Odisha government. So land acquisition is not a problem.<\/p>\n<p><a href=\"http:\/\/www.orissalinks.com\/orissagrowth\/wp-content\/uploads\/image\/Screen shot 2012-01-28 at 9_05_35 AM.png\" target=\"_self\"><img loading=\"lazy\" decoding=\"async\" width=\"515\" height=\"427\" alt=\"\" src=\"http:\/\/www.orissalinks.com\/orissagrowth\/wp-content\/uploads\/image\/Screen shot 2012-01-28 at 9_05_35 AM.png\" \/><\/a><\/p>\n<p><a target=\"_self\" href=\"http:\/\/www.orissalinks.com\/orissagrowth\/wp-content\/uploads\/image\/Screen shot 2012-01-28 at 9_07_31 AM.png\"><img loading=\"lazy\" decoding=\"async\" width=\"515\" height=\"366\" src=\"http:\/\/www.orissalinks.com\/orissagrowth\/wp-content\/uploads\/image\/Screen shot 2012-01-28 at 9_07_31 AM.png\" alt=\"\" \/><\/a><\/p>\n<p>As can be seen from the pictures above one can add 8+ more platforms perpendicular to the existing 4 platforms. All this can be done in a PPP mode with making good use of shopping, pedestrian plaza and surface transport center all in the ground level and higher and stretching all the way up to the Indira Gandhi park and the Assembly Hall, Secretariat, Rabindra Mandap etc.<\/p>\n<p>The new platforms could mostly be used for trains origniating and terminating at Bhubaneswar; thus&nbsp; not hampering the stopping times of thorough trains which would&nbsp; need an engine direction change if they go to the new platforms.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Update: Thanks very much Bikash Dash for the pointer to http:\/\/wiki.iricen.gov.in\/doku\/lib\/exe\/fetch.php?media=9209%3Aabkhare.pdf. The solution presented there is good enough. My only comment would be that since the expansion of existing Bhubaneswar station is economically feasible, they should just go ahead with that immediately (asap) and at the same time start acquiring land in the New Barang [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[48,201,3,815],"tags":[],"class_list":["post-5516","post","type-post","status-publish","format-standard","hentry","category-bhubaneswar-cuttack-puri","category-ecor","category-indian-railways-and-orissa","category-world-class-stations"],"_links":{"self":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/posts\/5516","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/comments?post=5516"}],"version-history":[{"count":0,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/posts\/5516\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/media?parent=5516"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/categories?post=5516"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.orissalinks.com\/orissagrowth\/wp-json\/wp\/v2\/tags?post=5516"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}